Concept redesign preview for Cal-Quake Construction — not the company’s official website.
Earthquake retrofit specialists · Los Angeles & all of California · CA Lic. #759817 info@cal-quake.com Call (800) 351-2969
Our work

What we’ve done and what we do.

Photos from our job sites. Tap a photo to enlarge it.

Soft-story retrofits

Crew in safety vests setting a steel frame in a soft-story parking level, with lumber stacked on the slabApartment building with new plywood shear walls and a scissor lift during a soft-story retrofitCrew placing a timber beam over rebar in a new footing trench under a buildingThree-story apartment building over open ground-floor parkingThree-story building over gated ground-floor parkingLong carport over a row of parked carsTwo-story apartment building with tuck-under parking

Foundations & house bolting

Steel post anchored to a concrete footing beside new framingCrawl space with a wood post on a new concrete footingWall opened at floor level to expose the studs and sill during a retrofitCal-Quake inspector checking a crawl space with a flashlight

Homes & the crew

Mid-century house with a carportTwo-story home on a tree-lined streetSingle-family home with a front lawnBlue two-story house with front stepsCal-Quake Construction pickup truck parked at an apartment job site
9,000+Properties

Retrofitted or given corrective foundation work across California.

450Soft-story projects

Completed under the Los Angeles-area ordinances.

30+Years

Earthquake retrofitting in Northern and Southern California.

24 hrCertification

Issued within 24 hours of inspection when a property is up to code.

What people say
“I selected Cal-Quake Construction only after carefully researching a bunch of companies. They’ve now completed several projects for me, and I would highly recommend them. So I’m passing this on to hopefully save you the time and trouble. We all know how difficult it is to find reliable construction companies, especially ones that specialize in this kind of work and do what they say they are going to do. And I know many of you are now in the same predicament as I am with a short fuse to retrofit these properties. ”

— WB

How we work

From inspection to city sign-off.

Request an inspection
  1. 01

    Inspection

    We inspect the property and tell you in writing what it needs — or issue a Retrofit Certification within 24 hours if it is already up to code.

  2. 02

    Engineering

    We consult our structural engineers on the specifics of your structure and the city’s requirements.

  3. 03

    Permits

    We pull the work permits, so the retrofit is designed and permitted the right way.

  4. 04

    Retrofit & sign-off

    Our crews build it, and we set up the appointments with city inspectors and make sure you pass inspection.

Work with Cal-Quake

Retrofit deadline coming up? Let’s get you compliant.

Call for an inspection, a retrofit certification or a soft-story evaluation. We pull the permits, meet the city inspectors and make sure you pass.