Soft-story retrofit ordinances.
What you need to know, city by city, across the Los Angeles region.
Soft-story buildings are multi-story properties with large open spaces on the first or second floor — usually a parking garage — instead of the walls a stable earthquake design needs. They can be critically damaged in an earthquake, which is why many cities now require them to be retrofitted.

Los Angeles
The City’s Soft Story Retrofit Program has identified about 13,500 buildings vulnerable to structural failure. Owners must comply with mandatory Ordinances 183893 and 184081 and retrofit within a set time frame. Targeted buildings have two or more stories of wood-frame construction and ground-floor parking or similar open space.
Santa Monica
Adopted in March 2017. Nearly 2,000 commercial and multi-family buildings were identified as potentially vulnerable and are required to comply with the City’s Seismic Retrofit Program.
Santa Monica guide → · Santa Monica Seismic Retrofit Program ↗
West Hollywood
Ordinance No. 17-1004, adopted April 17, 2017 and effective April 1, 2018: mandatory strengthening for wood-frame buildings with soft, weak or open-front walls, and voluntary provisions for cripple walls and sill-plate anchorage.
Beverly Hills
A mandatory ordinance, effective January 11, 2019, for wood-frame multi-family soft-story buildings permitted before January 1, 1978 with parking or open floor space at the ground floor or basement.
Pasadena
Ordinance No. 7345 (May 2019) covers about 493 wood soft-story buildings permitted on or before November 12, 1976, in three priority groups by size and units. Notices went to all three groups between December 2019 and March 2021.
Burbank
Three mandatory and two voluntary seismic retrofit ordinances under the 2019 California Building Code. Soft-story and cripple-wall retrofits of wood-frame residential buildings are currently voluntary.
Culver City
A phased program to identify, evaluate and upgrade the city’s hundreds of soft-story buildings, starting with a citywide survey in December 2018.
Culver City guide → · Culver City seismic retrofit program ↗
Glendale
Soft-story retrofits are currently voluntary, with about 1,000 vulnerable buildings counted; a mandatory ordinance is expected.
Summary of the programs as described on Cal-Quake’s website. Deadlines and criteria change — check with your city or call us before you plan.
From inspection to city sign-off.
- 01
Inspection
We inspect the property and tell you in writing what it needs — or issue a Retrofit Certification within 24 hours if it is already up to code.
- 02
Engineering
We consult our structural engineers on the specifics of your structure and the city’s requirements.
- 03
Permits
We pull the work permits, so the retrofit is designed and permitted the right way.
- 04
Retrofit & sign-off
Our crews build it, and we set up the appointments with city inspectors and make sure you pass inspection.
“I selected Cal-Quake Construction only after carefully researching a bunch of companies. They’ve now completed several projects for me, and I would highly recommend them. So I’m passing this on to hopefully save you the time and trouble. We all know how difficult it is to find reliable construction companies, especially ones that specialize in this kind of work and do what they say they are going to do. And I know many of you are now in the same predicament as I am with a short fuse to retrofit these properties. ”
— WB
Does my building need a soft-story retrofit?
If it has two or more stories of wood-frame construction with parking or other open space on the ground floor, and was built under older codes, it may fall under a mandatory program. In Los Angeles you can check your address on the LADBS website — or call us and we will check it for you.
Which cities have mandatory soft-story programs?
Los Angeles, Santa Monica, West Hollywood, Beverly Hills and Pasadena have mandatory programs. Burbank’s soft-story provisions are voluntary, Culver City has a phased program, and Glendale’s retrofits are currently voluntary.
Do you handle permits and city inspections?
Yes. From pulling work permits to setting up appointments with city inspectors to making sure you pass inspection.
Not sure where your building stands? We’ll check it.
Send us the address. We’ll tell you whether it falls under a mandatory program and what the retrofit involves.


